CertX reads your technical drawings and balloons every inspection characteristic — dimensions, tolerances, threads, surface finish — into an audit-ready ISO inspection sheet. Minutes, not hours.
Transcribing a busy drawing means squinting at every callout, copying tolerances into a table, and hoping nothing slipped. CertX does the reading; you do the deciding.
One engineer, a highlighter, and a spreadsheet.
The engine reads, balloons, and tabulates. You review.
Drop in a PDF or a scan. Multi-view, sectioned, detail callouts — CertX handles real shop drawings.
The engine detects each inspection characteristic, numbers it, and reads the nominal, tolerance and symbol.
Approve the high-confidence items, check the flagged ones, and export your ISO 9001 inspection sheet.
If it's an inspection characteristic on the sheet, CertX is built to find it and tabulate it.
Linear, diametral, radial and angular sizes pulled with their nominal value.
Plus/minus limits, fits (H7/g6) and geometric symbols with datums.
Metric and imperial thread specs, pitch and class of fit.
Roughness callouts and finish symbols, read per face.
Weld symbols, chamfers and edge notes flagged as characteristics.
Material, part number, general tolerances and revision from the block.
471114| Merkmal | Soll | Toleranz | Konf. | |
|---|---|---|---|---|
| 4 | Bohrung Ø | 24 | H7 | 98% |
| 7 | Gewinde | M16×1.5 | 6H | 95% |
| 11 | Planlauf ⟂ | 0.05 | A | 88% |
| 14 | Rauheit | Ra 1.6 | — | 91% |
| 15 | Wandstärke | 4.0 | ±0.1 | 84% |
Drawings and extractions are hosted in the EU (Supabase EU). Your IP never leaves Europe.
Each value links back to its region on the drawing — so an auditor can see exactly where it came from.
Output an inspection sheet aligned to ISO 9001:2015 — as PDF, Excel, or a German Prüfprotokoll.
Ten real production drawings, timed end to end. 156 inspection characteristics. Here is what they cost by hand, and with CertX.
| Drawing | Points | CertX (measured) | By hand (est.) | Faster by |
|---|---|---|---|---|
| Drawing A | 6 | 11.5 s | ~24 min | ~125× |
| Drawing B | 10 | 15.9 s | ~30 min | ~113× |
| Drawing C | 10 | 17.4 s | ~30 min | ~103× |
| Drawing D | 13 | 18.5 s | ~35 min | ~112× |
| Drawing E · rev 1 | 13 | 19.3 s | ~35 min | ~107× |
| Drawing E · rev 2 | 13 | 44.3 s | ~35 min | ~47× |
| Drawing F | 14 | 21.0 s | ~36 min | ~103× |
| Drawing G | 16 | 28.2 s | ~39 min | ~83× |
| Drawing H | 20 | 28.2 s | ~45 min | ~96× |
| Drawing I | 41 | 61.1 s | 1 h 17 m | ~75× |
| Total · 10 drawings | 156 | 4 min 25 s | ~6 h 24 m | ~87× |
Send us a part you'd normally balloon by hand. We'll show you the inspection sheet CertX gives back — in minutes.